TABLE
6.1
|
Sr.No. |
Nature
of Service |
Investigating Officer. |
Report
on prescribed Form |
Authority
competent to impose penalty in case of violation. |
|
(1) |
(2) |
(3) |
(4) |
(5) |
|
1. |
Interruption/Failure
of Power Supply (i)
Main Fuse Failure (ii) Restoring supply
after a fault |
S.D.O. S.D.O. |
VIIIA VIIIA |
Sr.Ex.Engr. Sr.Ex.Engr. |
|
2. |
Voltage
Problem |
S.E. |
VIIIB |
C.E. |
|
3. |
Metering Problem including Meter Supply |
Sr.Ex.Engr |
VIIIC |
S.E. |
|
4. |
Charges
& Payments (Billing Problems)
a) All categories of consumers with connected load less than100KW
and Bulk Supply & WPS Consumers. b) Rest of consumers |
Sr.Ex.Engr. S.E. |
VIIID VIIID |
S.E. C.E. |
|
5. |
Reconnection of Power Supply to the Consumers |
S.D.O. |
VIIIE
|
Sr.Ex.Engr. |
|
6 |
New Connection and Extension in load. i) Estimating charges for new and additional supply. (a)
For Loads up to 20kW (b)
For loads from 21kW to 50 kW (c)
For loads from 51kW to 100 kW (d)
For loads above 100 kW ii) Provision of supply & meter after deposit of
charges. (a)
For Loads up to 20kW (b)
For loads from 21kW to 50 kW (c)
For loads from 51kW to 100 kW (d)
For loads above 100 kW |
S.D.O. Sr.Ex.Eng. S.E. C.E. S.D.O. Sr.Ex.Eng. S.E. C.E. |
VIIIF VIIIF VIIIF VIIIF VIIIG VIIIG VIIIG VIIIG |
Sr.Ex.Eng. S.E. C.E. Board Sr.Ex.Eng. S.E. C.E. Board |
|
7. |
Making & Keeping Special Appointments: i)
At S.D.O. level ii)
At Sr.Ex.Engr. level iii)At
S.E.level. iv)At
C.E.level |
Sr.Ex.Engr. S.E. C.E. Board |
VIIIH VIIIH VIIIH VIIIH |
S.E. C.E. Board Board |
View Page Wise:
|1|2|3|4|5|6|7|8|9|10|11|12|13|14|15|16|17|18|19|20|21|22|23|24|25|26|27|28|29|30|31|32|
( Any Page of the report can also be visited directly by typing www.hpseb.com/CX.htm in Address Bar, where XX is actual page number eg. www.hpseb.com/C1.htm )
History | Organization | Achievements &
Milestones | Hydro
Potential
Invest in Hydro
| Mission | Hydro Policy | Tenders
|Tariff | Precautions | Photo Gallery | Feedback | Contact | HOME