Name of Transmission Licensee:HPSEB
Major System Disturbances (Grid Disturbances) Form No: P7
Sr. Particulars 2005-06 2006-07
No.      
       
1 Number of disturbances ( Major Grid Collapse) ----- -----
       
2 Total Duration of Disturbances ----- -----
       
3 Estimated unserved energy due to such ----- -----
  interruption(MU).    
       
4 Number of occassions when State system was ----- -----
  isolated from the Regional Grid due to system    
  disturbance affecting power supply in the State.    
       
5 Number of occassions when system remained ----- -----
  stable after having being isolated from the Regional    
  Grid due to system disturbance.    
       
6 Remedial measures to prevent grid System ----- -----
  disturbance.    
Chief Engineer(Trans.),
HPSEB, Hamirpur(H.P).