Name of Transmission Licensee:HPSEB
Peak Demand in MW Form No: P9
Sr.   Actual Actual Actual Actual Actual Previous Current Ensuing
No.   FY (n-5) FY (n-4) FY (n-3) FY (n-2) FY (n-1) Year Year Year
              Provisional Estimate Projection
              FY (n) FY (n+1) FY (n+2)
      2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07
1 Peak Period                
  a) Winter(Dec., 2004) Under Op. 360.00 390.10 410.20 457.02 507.02 557.72 601.72
    Wing              
  b) Summer(June, 2004) -do- 435.40 460.40 499.80 521.80 575.89 633.46 683.70
  c) Other(March, 2005) -do- 416.00 439.10 469.00 499.10 532.71 560.00 590.00
                   
2 Maximum Peak Demand Load restricted/to be restricted as per the direction of Power Controller and
  a) Restricted it was/is not accounted.
  b) Unrestricted                
                   
3 Peak Availability Assessed   ---- ---- ---- ---- 620.00 700.00 750.00
  By Transco                
                   
4 Shortfall in meeting Peak As per directions of Power Controller.
  Demand                
  a) Restricted                
  b) Unrestricted                
                   
Notes:- Details of Peak Demand and Load Rostering may be provided along with this format ie., in terms of MW, MU
    and number of hours per day.