| |
|
|
|
|
FORM-3 |
| SALIENT FEATURES
OF HYDROELECTRIC PROJECT |
|
| NAME OF COMPANY: |
HPSEB |
|
|
|
| NAME OF POWER STATION:
BANER POWER HOUSE |
|
| 1. Location |
|
|
|
|
|
| State/Distt. |
HP |
KANGRA |
|
|
|
| River |
BANER |
(TRIBUTARY
OF RIVER BEAS) |
| |
|
|
|
| 2. Diversion Tunnel |
|
|
|
| Size, shape |
1.8m DIA-HOURSE SHOE |
|
|
| Length |
134m |
|
|
|
|
| |
|
|
|
| 3. Dam |
|
|
|
| Type |
NA |
|
|
|
|
| Maximum dam
height |
NA |
|
|
|
|
| |
|
|
|
| 4. Spillway |
|
|
|
| Type |
RECTANGULAR |
|
|
|
| Crest level
of spillway |
1727.10 |
|
|
|
|
| |
|
|
|
| 5. Reservoir |
|
|
|
| Full Reservior Level (FRL) |
NA |
|
|
|
|
| Minimum Draw
Down Level (MDDL) |
NA |
|
|
|
|
| Live storage
(MCM) |
NA |
|
|
|
|
| |
|
|
|
| 6. Desilting Arrangement |
|
|
|
| Type |
HOPPER |
|
|
|
| Number and
Size |
4 No.x 13.7 x 6.2 x
4.26m |
|
|
| Particle
size to be removed(mm) |
0.2mm |
|
|
|
|
| |
|
|
|
| 7. Head Race Tunnel |
|
|
|
| Size and type |
1.8m hourse shoe |
|
|
|
| Length |
2298m |
|
|
|
|
| Design
discharge(Cumecs) |
4.3cum/sec. |
|
|
|
| |
|
|
|
| 8. Surge Shaft |
|
|
|
| Type |
Circular |
|
|
|
|
| Diameter |
5.0m |
|
|
|
|
| Height |
28.5m |
|
|
|
|
| |
|
|
|
| 9. Penstock/Pressure shafts |
|
|
|
| Type |
Steel |
|
|
|
|
| Diameter
& Length |
1.2m - 790m |
|
|
|
| |
|
|
|
|
|
| 10. Power House |
|
|
|
| Type |
Surface |
|
|
|
|
| Installed
capacity (No of units x MW) |
3x4 MW |
|
|
|
|
| Peaking
capacity during lean period (MW) |
NA |
|
|
|
|
| Type of
turbine |
Vertical Pelton |
|
|
|
| Rated
Head(M) |
330 Mtr. |
|
|
|
|
| Rated
Discharge(Cumecs) |
4.3 cum/sec. |
|
|
|
| |
|
|
|
| 11. Tail Race Tunnel |
|
|
|
| Diameter, shape |
Rectangular covered |
2.5x2.5m |
|
|
| Length |
53.50m |
|
|
|
|
| Minimum tail
water level |
0.705m |
|
|
|
|
| |
|
|
|
| 12. Switchyard |
|
|
|
| Type of Switch gear |
VCB |
|
|
| No. of
generator bays |
3 |
|
|
|
|
| No. of Bus
coupler bays |
- |
|
|
|
|
| No. of line
bays |
3 |
|
|
|
|
| Note:
Specify limitation on generation
during specific time period on account of restriction(s) on |
| water
use due to irrigation, drinking water, industrial, environmental
considerations etc. |
|
|
|
|
|
PETITIONER
|
|
|
|
|
|
|