FORM-3 |
|
|
|
SALIENT FEATURES OF
HYDROELECTRIC PROJECT |
|
| NAME OF COMPANY: |
HPSEB |
|
|
|
|
| NAME OF POWER STATION :3x40 MW Bhaba Power House. |
|
|
| 1. Location |
|
|
|
|
|
|
| State/Distt. |
Himachal |
Pradesh |
Distt. |
Kinnaure |
|
|
| River |
Bhaba |
Khad |
|
|
|
|
| |
|
|
|
|
| 2. Diversion Tunnel |
|
|
|
|
| Size, shape |
Not applicable |
|
|
|
|
| Length |
|
|
|
|
|
|
| |
|
|
|
|
| 3. Dam |
|
|
|
|
| Type |
weir
with gated under sluice across Bhaba Khud. |
|
|
|
| Maximum dam
height |
18 mtr. |
|
|
|
|
|
| |
|
|
|
|
| 4. Spillway |
|
|
|
|
| Type |
ungated |
|
|
|
|
|
| Crest level
of spillway |
EL+_2431 mtr. |
above sea level |
|
|
|
| |
|
|
|
|
| 5. Reservoir |
|
|
|
|
| Full Reservior Level (FRL) |
2426.50 Mtrs. |
|
|
|
|
| Minimum Draw
Down Level (MDDL) |
2420 mtrs. |
|
|
|
|
| Live storage
(MCM) |
18.16 Hec. Mtrs. |
|
|
|
|
| |
|
|
|
|
| 6. Desilting Arrangement |
|
|
|
|
| Type |
TrepeZoidal Type |
|
|
|
|
| Number and
Size |
10 Nos. 50x25x6 |
|
|
|
|
| Particle size
to be removed(mm) |
0.2mm |
|
|
|
|
|
| |
|
|
|
|
| 7. Head Race Tunnel |
|
|
|
|
| Size and type |
2.50 Mtrs, Horse shoe
type |
|
|
|
| Length |
5.50 Mtrs. |
|
|
|
|
|
| Design
discharge(Cumecs) |
17 Cumecs. |
|
|
|
|
| |
|
|
|
|
| 8. Surge Shaft |
|
|
|
|
| Type |
Circular RCC 200 orfic
type. |
|
|
|
| Diameter |
4.50 Mtrs. |
|
|
|
|
|
| Height |
92 Mtrs. |
|
|
|
|
|
| |
|
|
|
|
| 9. Penstock/Pressure shafts |
|
|
|
|
| Type |
Circular Steel lined |
|
|
|
|
| Diameter
& Length |
Main 2 fef mtrs & sub 1.94 mtrs, 1423
mtrs long. |
|
| |
|
|
|
|
|
|
| 10. Power House |
|
|
|
|
| Type |
Under Ground |
|
|
|
|
| Installed
capacity (No of units x MW) |
120 MW (3x40MW) |
|
|
|
|
| Peaking
capacity during lean period (MW) |
120
MW |
|
|
|
|
|
| Type of
turbine |
2 Jet Vertical shaft,Pelton, |
|
|
|
| Rated Head(M) |
931.50 Mtrs. |
|
|
|
|
| Rated
Discharge(Cumecs) |
17
cumecs. |
|
|
|
|
| |
|
|
|
|
| 11. Tail Race Tunnel |
|
|
|
|
| Diameter, shape |
4.00Mtrs. D shaped. |
|
|
|
|
| Length |
|
|
|
|
|
|
| Minimum tail
water level |
|
|
|
|
|
|
| |
|
|
|
|
| 12. Switchyard |
|
|
|
|
| Type of Switch gear |
GIS (SF6gas) |
|
|
|
| No. of
generator bays |
3 nos |
|
|
|
|
|
| No. of Bus
coupler bays |
1 |
|
|
|
|
|
| No. of line
bays |
2 |
|
|
|
|
|
| Note:
Specify limitation on generation
during specific time period on account of restriction(s) on |
|
| water
use due to irrigation, drinking water, industrial, environmental
considerations etc. |
|
|
|
|
|
|
|
|
PETITIONER
|
|
|
|
|
|
|
|
|
|