FORM-2  
   
  Details of COD, Type of hydro station, Capacity Index, Primary energy rate
NAME OF COMPANY:                Himachal Pradesh State Electricity Board                                                                    
NAME OF POWER STATION :   Binwa HEP
   
Sl. No. Description   As per CERC norms for tariff period 2004-05 to 2008-09
         
1 Installed Capacity MW 2 x 3MW  = 6 MW
2 Free power to home state %  
3 Date of commercial operation    
  Unit-1   29/8/1984
  Unit-2   8/10/1984
4 Type of Station    
  a) Surface/underground   Surface
  b) Purely ROR/ Pondage/Storage   Storage
  c) Peaking/non-peaking   Peaking
  d) No. of hours of peaking   1 hour
  e) Overload capacity(MW) & period   …Nil…        
5 Type of excitation    
  a) Rotaing exciters on generator   Self exited Generator (PE)
  b) Static excitation   --
6 Design Energy (Annual)1 Gwh 29.248 MU (3 Gwh)
7 Auxiliary Consumption % 0.2%
8 Transformation losses % 0.5%
9 Saleable Primary Energy Gwh 30 MU (3 Gwh)        
10 Primary Energy Rate paise/Kwh 82 paise
11 Primary Energy Charge Rs. in crore Rs. 35 Cr.
12 Capacity Index   100%
  Normative value    
1 Monthwise Design energy figures to be given separately with the petition.
PETITIONER