| Break-up of Construction/Supply/Service packages | FORM-5D | |||||||||
| Name of the Company : | HPSEB | |||||||||
| Name of the Power Station : | 1.75 MW Chaba Power House. | |||||||||
| Sl.No. | Name/No. of Construction / Supply / Service Package | Scope of works (in line with head of cost break-ups as applicable) | Whether awarded through ICB/DCB/ Depatmentally/ Deposit Work | No. of bids received | Date of Award | Date of Start of work | Date of Completion of Work | Value of Award1in (Rs. Cr.) | Firm or With Escalation in prices | Actual expenditure till the completion or up to COD whichever is earlier(Rs.Cr.) |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | (11) |
| NOTE : IT DOES NOT PRETAINS TO GHANVI POWER HOUSE | ||||||||||
| Not | Applicable | |||||||||
| 1 If there is any package, which need to be shown in Indian Rupee and foreign currency(ies), the same should be shown separatly alongwith the currency, the exchange rate and the date e.g. Rs.80 Cr+US$50m=Rs.280Cr at US$=Rs40 as on say 4.1.1999. | ||||||||||
| PETITIONER | ||||||||||