FORM-3
            SALIENT  FEATURES  OF  HYDROELECTRIC  PROJECT
NAME OF COMPANY:  HPSEB  
NAME OF POWER STATION: GIRI POWER HOUSE  
1. Location          
State/Distt. HIMACHAL PRADESH / SIRMOR    
River GIRI        
2. Diversion Tunnel    
Size, shape NA        
Length NA        
3. Dam    
Type DIVERSION      
Maximum dam height 615.46 MTR (TOP LEVEL)    
4. Spillway    
Type STEEL GATED STRUCTURE    
Crest level of spillway 612.647 MTR.      
5. Reservoir    
Full Reservior Level (FRL) 615.60 MTR      
Minimum Draw Down Level (MDDL) 612.65 MTR.      
Live storage (MCM) 209920 CUB. MTR.      
6. Desilting Arrangement    
Type SILT EJECTOR TUNNEL AT INTAKE=1 NO.  
  SILT EJECTOR AT MARAR ADIT =3 NOS PUMPS OF
  DIA 450 MM.      
Number and Size          
Particle size to be removed(mm) 0.053MM        
7. Head Race Tunnel    
Size and type 3.66 MTR DIA CIRCULAR    
Length 7.273 KMS.      
Design discharge(Cumecs) 47 CUMECS      
8. Surge Shaft    
Type WELL TYPE CONCRETE STRUCTURE  
Diameter 10.668 MTR.      
Height 66 MTR.        
9. Penstock/Pressure shafts    
Type STEEL LINED      
Diameter & Length 2.5 MTR DIA 547 MTR. LONG (2 NOS.)  
10. Power House    
Type SEMI UNDER  GROUND    
Installed capacity (No of units x MW) 2X30 MW        
Peaking capacity during lean period (MW) 24 MW        
Type of turbine VERTICAL FRANCIS      
Rated Head(M) 146.30 MTR.      
Rated Discharge(Cumecs) 47 CUMECS.      
11. Tail Race Tunnel    
Diameter, shape RECTANGULAR      
Length 800 MTR.        
Minimum tail water level 435 MTR.        
12. Switchyard    
Type of Switch gear SF-6 / ABCB  
No. of generator bays 2        
No. of Bus coupler bays 1        
No. of line bays 6        
Note: Specify  limitation on generation during specific time period on account of restriction(s) on
water use due to irrigation, drinking water, industrial, environmental considerations etc.
 
PETITIONER