FORM-2
   
  Details of COD, Type of hydro station, Capacity Index, Primary energy rate
NAME OF COMPANY:                             HPSEB                                                                    
NAME OF POWER STATION :                GAJ Power House
   
Sl. No. Description   As per CERC norms for tariff period 2004-05 to 2008-09
         
1 Installed Capacity 10.5 MW  
2 Free power to home state %  
3 Date of commercial operation    
  Unit-1 30/7/96  
  Unit-2 15/9/96  
  Unit-3 23/6/96  
4 Type of Station    
  a) Surface/underground Surface  
  b) Purely ROR/ Pondage/Storage ROR  
  c) Peaking/non-peaking Non-peaking  
  d) No. of hours of peaking    
  e) Overload capacity(MW) & period            
5 Type of excitation    
  a) Rotaing exciters on generator    
  b) Static excitation Static  
6 Design Energy (Annual)1 36.41 Gwh  
7 Auxiliary Consumption 0.25%  
8 Transformation losses 0.70%  
9 Saleable Primary Energy 50.57 Gwh          
10 Primary Energy Rate 100 paise/Kwh  
11 Primary Energy Charge Rs. in crore  
12 Capacity Index 100%  
  Normative value    
1 Monthwise Design energy figures to be given separately with the petition.
PETITIONER