Break up of Capital Cost for Plant & Equipment FORM- 5C
   
  NAME OF COMPANY: HPSEB  
  NAME OF POWER STATION:  2x11.25 GHANVI POWER HOUSE  
                                                           (Rs. in crore)                                                                                                             
Sl. No. Head of works Original Cost as approved  by Authority     Cost on COD Variation Reasons for variation Admitted cost
1 2 3 4 5 6 7
1.0 Generator, turbine & Acessories          
1.1 Generator package          
1.2 Turbine package          
1.3 Unit control Board          
1.4 C&I package          
1.5 Bus Duct of GT connection          
1.6 Total (Generator, turbine & Acessories)          
2.0 Auxiliary Electrical Equipment          
2.1 Step up transformer          
2.2 Unit Auxiliary Transformer          
2.3 Local supply transformer          
2.4 Station transformer          
2.5  SCADA          
2.6 Switchgear, Batteries, DC dist. Board           
2.7 Telecommunication equipment          
2.8 Illumination of Dam, PH and Switchyard          
2.9 Cables & cable facilities, grounding          
2.10 Diesel generating sets          
2.11 Total (Auxiliary Elect. Equipment)          
3.0 Auxiliary equipment & services for power station          
3.1 EOT crane          
3.2 Other cranes          
3.3 Electric lifts & elevators          
3.4 Cooling water system          
3.5 Drainage & dewatering system          
3.6 Fire fighting equipment          
3.7 Air conditioning, ventilation and heating          
3.8 Water supply system          
3.9 Oil handling equipment          
3.10 Workshop machines & equipment          
3.11 Total (Auxiliary equipt. & services for PS)           
4.0 Switchyard package        
5.0 Initial spares for all above equipments          
6.0 Total (Plant & Equipment)          
   
PETITIONER