FORM-3
            SALIENT  FEATURES  OF  HYDROELECTRIC  PROJECT  
NAME OF COMPANY: Himachal Pradesh State Electricity Board
NAME OF POWER STATION:   Khauli HEP  
1. Location          
State/Distt. Himachal Pradesh, Distt. Kangra    
River Khauli Khad (Tributary of river Beas)  
2. Diversion Tunnel    
Size, shape --        
Length --        
3. Dam    
Type --        
Maximum dam height --        
4. Spillway    
Type          
Crest level of spillway 1684.5 m        
5. Reservoir    
Full Reservior Level (FRL) 1684.5 m        
Minimum Draw Down Level (MDDL) 1681.60 m        
Live storage (MCM) (+/-) 0.001740      
6. Desilting Arrangement    
Type Surface        
Number and Size 73.40m x 5.40m x 3.25m      
Particle size to be removed(mm) 0.20mm and above      
     
7. Head Race Tunnel    
Size and type --        
Length --        
Design discharge(Cumecs) --        
8. Surge Shaft    
Type --        
Diameter --        
Height --        
9. Penstock/Pressure shafts    
Type Surface, circular steel penstock    
Diameter & Length 0.95 m dia and 1315 m length    
10. Power House    
Type Surface        
Installed capacity (No of units x MW) 2 x 6 MW = 12 MW      
Peaking capacity during lean period (MW) 1.6 MW        
Type of turbine Pelton, Horizontal axis.      
Rated Head(M) 484.88 m        
Rated Discharge(Cumecs) 2.9 Cumecs      
11. (a) Tail Race Tunnel    
Diameter, shape --        
Length --        
Minimum tail water level --        
11.(b)  Tail Race Channel    
Type Cut & Cover rectangular    
Length (+/-) 90 m        
Size 1.50m x 1.40 m      
Bed slope 1 : 500        
12. Switchyard    
Type of Switch gear VCB        
No. of generator bays 2 Nos.        
No. of Bus coupler bays 1 No        
No. of line bays 2 Nos.        
Note: Specify  limitation on generation during specific time period on account of restriction(s) on
water use due to irrigation, drinking water, industrial, environmental considerations etc.
PETITIONER