| FORM-3 | |||||
| SALIENT FEATURES OF HYDROELECTRIC PROJECT | |||||
| NAME OF COMPANY: | Himachal Pradesh State Electricity Board | ||||
| NAME OF POWER STATION: Khauli HEP | |||||
| 1. Location | |||||
| State/Distt. | Himachal Pradesh, Distt. Kangra | ||||
| River | Khauli Khad (Tributary of river Beas) | ||||
| 2. Diversion Tunnel | |||||
| Size, shape | -- | ||||
| Length | -- | ||||
| 3. Dam | |||||
| Type | -- | ||||
| Maximum dam height | -- | ||||
| 4. Spillway | |||||
| Type | |||||
| Crest level of spillway | 1684.5 m | ||||
| 5. Reservoir | |||||
| Full Reservior Level (FRL) | 1684.5 m | ||||
| Minimum Draw Down Level (MDDL) | 1681.60 m | ||||
| Live storage (MCM) | (+/-) 0.001740 | ||||
| 6. Desilting Arrangement | |||||
| Type | Surface | ||||
| Number and Size | 73.40m x 5.40m x 3.25m | ||||
| Particle size to be removed(mm) | 0.20mm and above | ||||
| 7. Head Race Tunnel | |||||
| Size and type | -- | ||||
| Length | -- | ||||
| Design discharge(Cumecs) | -- | ||||
| 8. Surge Shaft | |||||
| Type | -- | ||||
| Diameter | -- | ||||
| Height | -- | ||||
| 9. Penstock/Pressure shafts | |||||
| Type | Surface, circular steel penstock | ||||
| Diameter & Length | 0.95 m dia and 1315 m length | ||||
| 10. Power House | |||||
| Type | Surface | ||||
| Installed capacity (No of units x MW) | 2 x 6 MW = 12 MW | ||||
| Peaking capacity during lean period (MW) | 1.6 MW | ||||
| Type of turbine | Pelton, Horizontal axis. | ||||
| Rated Head(M) | 484.88 m | ||||
| Rated Discharge(Cumecs) | 2.9 Cumecs | ||||
| 11. (a) Tail Race Tunnel | |||||
| Diameter, shape | -- | ||||
| Length | -- | ||||
| Minimum tail water level | -- | ||||
| 11.(b) Tail Race Channel | |||||
| Type | Cut & Cover rectangular | ||||
| Length | (+/-) 90 m | ||||
| Size | 1.50m x 1.40 m | ||||
| Bed slope | 1 : 500 | ||||
| 12. Switchyard | |||||
| Type of Switch gear | VCB | ||||
| No. of generator bays | 2 Nos. | ||||
| No. of Bus coupler bays | 1 No | ||||
| No. of line bays | 2 Nos. | ||||
| Note: Specify limitation on generation during specific time period on account of restriction(s) on | |||||
| water use due to irrigation, drinking water, industrial, environmental considerations etc. | |||||
| PETITIONER | |||||