FORM- 5C |
| Break up of Capital
Cost for Plant & Equipment |
|
|
| |
|
|
|
| |
NAME OF COMPANY: |
Himachal
Pradesh State Electricity Board |
| |
NAME OF POWER
STATION: 3 x
42 MW Larji Hydel Project |
|
| |
(Rs. in
crore)
|
|
| Sl.
No. |
Head
of works |
Original
Cost as approved by Authority
in lacs. |
Cost
on COD |
Variation |
Reasons
for variation |
Admitted cost |
| 1 |
2 |
3 |
4 |
5 |
6 |
7 |
| 1.0 |
Generator, turbine & Acessories |
|
|
|
|
|
| 1.1 |
Generator package |
8615.54 |
8215.54 |
|
|
|
| 1.2 |
Turbine package |
|
|
|
|
| 1.3 |
Unit control Board |
199.15 |
125 |
|
|
|
| 1.4 |
C&I package |
|
|
|
|
|
| 1.5 |
Bus Duct of GT connection |
232.00 |
144 |
|
|
|
| |
Miscellaneous |
163.88 |
75.6 |
|
|
|
| 1.6 |
Total (Generator, turbine &
Acessories) |
9210.57 |
8560.14 |
|
|
|
| 2.0 |
Auxiliary Electrical Equipment |
|
|
|
|
|
| 2.1 |
Step up transformer |
382.80 |
355 |
|
|
|
| 2.2 |
Unit Auxiliary Transformer |
15.66 |
|
|
|
|
| 2.3 |
Local supply transformer |
18.56 |
|
|
|
|
| 2.4 |
Station transformer |
34.80 |
|
|
|
|
| 2.5 |
SCADA |
430.16 |
676 |
|
|
due torise |
| 2.6 |
L.T. Switchgear |
69.60 |
|
|
|
in rates |
| Batteries, |
34.80 |
77.00 |
|
42.2 |
due torise |
| DC dist. Board
|
5.80 |
|
|
|
in rates |
| 11 kV
Distribution Board |
15.66 |
|
|
|
|
| 2.7 |
Telecommunication
equipment |
22.04 |
|
|
|
|
| 2.8 |
Illumination of Dam, PH and
Switchyard |
87.00 |
20.00 |
|
|
|
| 2.9 |
Cables |
469.80 |
254.23 |
|
|
|
| Cable
facilities, |
55.68 |
|
|
|
|
| Grounding |
92.80 |
80.00 |
|
|
|
| 2.10 |
Diesel generating sets |
23.20 |
20.00 |
|
|
|
| |
Miscellaneous |
34.63 |
|
|
|
|
| |
Electrical Test & Lab. Equip. |
46.40 |
|
|
|
|
| |
Transformer rails |
4.64 |
|
|
|
|
| 2.11 |
Total (Auxiliary Elect.
Equipment) |
1844.03 |
1482.23 |
|
|
|
| 3.0 |
Auxiliary equipment & services
for power station |
|
|
|
|
|
| 3.1 |
EOT crane |
|
|
|
|
|
| |
125/25 T |
139.20 |
82.00 |
|
|
|
| |
5 T |
11.60 |
5.00 |
|
|
|
| 3.2 |
Other cranes |
42.63 |
|
|
|
|
| 3.3 |
Electric lifts & elevators |
27.84 |
7.00 |
|
|
|
| 3.4 |
Cooling water system |
162.40 |
45.65 |
|
|
|
| 3.5 |
Drainage & dewatering system |
46.40 |
33.00 |
|
|
|
| 3.6 |
Fire fighting equipment |
87.00 |
20.00 |
|
|
|
| 3.7 |
Air conditioning, ventilation and
heating |
84.50 |
77.00 |
|
|
|
| 3.8 |
Water supply system |
17.40 |
5.00 |
|
|
|
| 3.9 |
Oil handling equipment |
17.40 |
10.00 |
|
|
|
| 3.10 |
Workshop machines & equipment |
34.80 |
10.00 |
|
|
|
| |
Assembly line facilities i/c hard
standing |
11.60 |
|
|
|
|
| |
Miscellaneous |
11.82 |
|
|
|
|
| |
Hatchways |
11.60 |
5.00 |
|
|
|
| 3.11 |
Total (Auxiliary
equipt. & services for PS) |
706.19 |
299.65 |
|
|
|
| 4.0 |
Switchyard package |
2060.56 |
173.00 |
|
|
|
| 5.0 |
Initial spares for all above
equipments |
|
|
|
|
|
| |
Spares for
Generator, turbine & accessories |
633.94 |
255.00 |
|
|
|
| |
Spares for auxiliary electrical
equip. |
51.66 |
10.50 |
|
|
|
| |
Spares for auxiliary equip. &
services |
20.96 |
|
|
|
|
| |
Spares for switchyard |
56.71 |
48.70 |
|
|
|
| |
Total spares |
763.27 |
314.20 |
|
|
|
| 6.0 |
Total (Plant & Equipment) |
14584.62 |
|
|
|
|
| |
|
|
|
|
|
|
| 1 |
Preliminary works |
295.90 |
|
|
|
|
| 2 |
Total (Generator,
turbine & Acessories) |
9210.57 |
|
|
|
|
| Total (Auxiliary Elect.
Equipment) |
1844.03 |
|
|
|
|
| Total (Auxiliary
equipt. & services for PS) |
706.19 |
|
|
|
|
| Spares for above |
706.56 |
|
|
|
|
| Sub total |
12467.35 |
|
|
|
|
| |
CST on the above |
498.69 |
5.6 |
|
|
|
| |
Transportation,
handling & insurance charges @ 6% |
748.04 |
650 |
|
|
|
| |
Erection
& commissioning charges @ 8% |
997.39 |
850 |
|
|
|
| |
Total
generating plant & equip. |
14711.47 |
1505.6 |
|
|
|
| |
|
|
|
|
|
|
| 3 |
Switchyard package |
2060.56 |
900 |
|
|
|
| Spares for above |
56.71 |
|
|
|
|
| Sub total |
2117.27 |
|
|
|
|
| |
CST on the above |
84.69 |
36 |
|
|
|
| |
Transportation,
handling & insurance charges @ 6% |
127.04 |
60 |
|
|
|
| |
Erection
& commissioning charges @ 8% |
169.38 |
72 |
|
|
|
| |
Total
for swithchyard package |
2498.38 |
168 |
|
|
|
| 4 |
Losses
on stock @ .25% |
40.11 |
|
|
|
|
| 5 |
Maintenance
during construction @ 1.00% |
160.43 |
15 |
|
|
|
| 6 |
Procurement
& inspection charges @ 2% |
320.86 |
54 |
|
|
|
| 7 |
Contigency
@ 3% in items 2 & 3 |
516.30 |
315 |
|
|
|
| 8 |
Total |
18543.45 |
|
|
|
|
| 9 |
Establishment
@ 6% of above. |
1112.61 |
820 |
|
|
|
| 10 |
T&P
@ 1% |
185.43 |
38 |
|
|
|
| 11 |
Audit
& accounts charges @ 1% |
185.43 |
19 |
|
|
|
| |
Grand
total |
20026.92 |
|
|
|
|
| |
|
|
|
|
|
|
| Note: - |
There is a totalling error of Rs.52.80 lacs in
the in auxiliary equipment sub total which is given as Rs.2042.04 in the DPR
whereas it should be Rs.2094.84lacs. |
| |
|
|
|
|
|
|
| |
|
|
|
|
PETITIONER |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|