Basinwise Potential in H.P.
CHENAB BASIN
|
S.No. |
Name |
River/Khad |
MW |
|
1 |
Shansha |
Shansha Nallah |
0.20 |
|
2 |
Sishu |
Sishu Nallah |
0.10 |
|
3 |
Billing |
Billing Nallah |
0.20 |
|
4 |
Killar |
Mahal Nallah |
0.30 |
|
5 |
Thirot |
Thirot Nallah |
4.50 |
|
6 |
Khoksar/Tunsha |
Chandra River |
90.00 |
|
7 |
Bardang/Tingar |
Chenab River |
114.00 |
|
8 |
Sachkhas/Sagpari |
Chenab River |
210.00 |
|
9 |
Gyspa Dam |
Bhaga Nallah |
240.00 |
|
10 |
Gondala/Chandra
Bhaga |
Bhaga Nallah |
144.00 |
|
11 |
Chhatru |
Chandra River |
108.00 |
|
12 |
Reoli/Dugli |
Chenab River |
715.00 |
|
13 |
Seli |
Chenab River |
150.00 |
|
14 |
Patam |
Miyar Nallah |
60.00 |
|
15 |
Teling |
Chandra River |
81.00 |
|
16 |
Tinget |
Miyar Nallah |
81.00 |
|
17 |
Miyar |
Miyar Nallah |
90.00 |
|
18 |
Tandi |
Chenab River |
150.00 |
|
19 |
Rashil |
Chenab River |
150.00 |
|
20 |
Dugar |
Chenab River |
360.00 |
|
|
Total |
|
2748.30 |
|
|
|
|
|
|
|
I. Under Operation. |
|
5.30 |
|
|
II. Under Construction with
State/Central/Pvt. |
|
|
|
Sector |
|
|
|
|
III DPR Ready |
|
|
|
|
IV Under
Investigation |
|
240 |
Beas Basin
| Yamuna Basin
| Satluj Basin
| Ravi Basin
| Chenab Basin