Milestones

We are proud of :

  • First hill state in the country to achieve 100% electrification of all census village in the year 1988.
  • Our consumer coverage has touched 98% as per REC's survey & we have been adjudged one of the best Board's in the country.
  • Installed and commissioned a power house which is at the highest altitude in the world (Rongtong Power House at an altitude of approx. 12,000 ft.)
      
                            Rongtong Reservoir         ===>

Rongtong Power House
    

  • Installed and commissioned a totally underground Power House which is unique  in Asia (Bhaba Power House - 120 MW).
      
         Bhaba Power House's Machine room    ===>

Bhaba Power House