1
Guidelines for AT&C losses
2
RAPDRP general guidelines
3
Interaction with TPIEA-EA, Utilities & Meter Manufacturers
4
HPSEBL Secured DLMS User manual
5
Status of the Readings of Ring Fencing Meters at 14-Towns
6
CALMU
meter Replacement
7
Consumer DTR Wise R-APDRP Scheme
8
Installation of the System Meters(Substation Feeder,HT Consumer & DTR)
9
AT&C Methodology by PFC
10
TPIEA Data Format by PFC
11
Supply of Modems at Respective Division Stores in the 14-Towns under....
12
MIS HP Jan 2012
13
Status of AT&C losses for three billing cycles and Installation status of Substation Meters and HT Consumer Meters.
14
Rectifications required by PFC in baseline data dated 25-Nov-2011
All Contents are Copyright protected 2005 HPSEB All rights Reserved.
A
H.P.S.E.B Ltd
presentation.