PROJECTS WHICH HAVE TO BE RE ADVERTISED

     
S.N. Name of Project Name of Basin Installed capacity(MW)
1 Patam Chenab 60.00
2 Seli Chenab 454.00
3 Dugar Chenab 236.00
4 Gyspa Chenab 170.00
5 Sach-Khas Chenab 149.00
6 Reoli/Dugli Chenab 268.00
7 Kuling Lara Satluj 40.00
8 Lara Sumta Satluj 104.00
  Total   1481.00

 

>