Sr. No. |
Name of firms. |
By whom Black listed |
Period of
Blacklisting |
Mfg./
Material/
Items |
Remarks |
| 1. |
M/s Bhandari Poles & Allied Industries Village & P.O. GHO
Shahpur Kandi Road, Distt. Gurdaspur (PB). |
Engineer in Chief (MM). PSEB, Patiala. |
12-9-02 to 11-9-07
(5 years)
|
PCC Poles.
|
|
|
2 |
M/s Bhandari Poles & Allied Industries Village & P.O. GHO
Shahpur Kandi Road, Distt. Gurdaspur (PB). |
Engineer in Chief (MM). PSEB, Patiala. |
12-9-02 to 11-9-07
(5 years)
|
PCC Poles.
|
|
| 3. |
M/S Chopra Cables Pvt. Ltd. A-37, Sector-VII, Noida-201301. |
Engineer in Chief (MM). PSEB, Patiala. |
12-9-02 to 11-9-07
(5 years)
|
ACSR Weasel Conductor |
|
| 4. |
M/S Zela Industrial Corporation (P) Ltd, B-8 Industrial
Area, Meerut Road Ghaziabad 201003. |
Engineer in Chief (MM). PSEB, Patiala |
30-10-02 to29-10-07 |
Kit Kite |
|
| 5. |
M/S Frexton Cables (India)-13, DLF, Industrial Area,
Majafgarh, Road New Delhi-110015. |
Engineer in Chief (MM) Central Purchase Orgs.PSEB
Patiala. |
6-1-03 to 5-1-08
(5 Years) |
Twin Core PVC Cable
| |
| 6. |
M/s RMS Automation Systm Pvt. Ltd., W-218 MIDC Ahmedabad
Nasik 422010 India. |
Engineer in Chief
( OP) (North) PSEB Jalandhar
|
20-1-03 to 19-1-08 (5Years) |
RCLM Equipments |
|
| 7. |
M/S Kay Cee Traders, 8671, Bharagarh, Roshanara Road, Sabji
Mandi, Delhi-7 |
Engineer in Chief (MM). PSEB, Patiala |
7.2.03 to 6.2.08
(5 years) |
LT Shackle Insulators. |
|
| 8. |
M/s B.S. (Wires & Cables) Industires(P) Ltd, G.T. Road, Post
Office Dulhipur, Distt. Varanassi(UP) Railway Station, Mugalsarai. |
Engineer in Chief (MM). PSEB, Patiala |
5.2.03 to 4.2.08
(5 years) |
GMS Wires. |
|
| 9. |
M/s Modern Savilations, 3705, Gali Barna Bara Tooti, Sadar
Bazar, Delhi-110006. |
Engineer in Chief (MM). PSEB, Patiala |
29.4.03 to 28.4.08
(5 years) |
LT LIne PVC spacers. |
|
| 10. |
M/s Saukhla Udyog, Marudhar Industrial Area, II Pase, Basni,
Jodhour. |
Engineer in Chief (MM). PSEB, Patiala |
25.4.03 to 24.4.08
(5 years) |
Transformers |
|
| 11. |
M/s Meryfur Industries, 251/6 Shriram Lane, G.T. Road,
Shahdara, Delhi-32. |
Engineer in Chief (MM). PSEB, Patiala |
21.4.03 to 20.4.08
(5 years) |
Twin core LT PVC Cables. |
|
| 12. |
M/s Elpro International Limited Switchgear Mfg. Division,
Plot No.89 & 90, I.D.A. Gandhinagar, Balanagar, Hyderabad-500037. |
Chief Engineer
(T&T) A.S.E.B. |
Not to allow participating in the future tender in
A.S.E.B.From3.7.2003. |
Insulators. |
|
| 13. |
M/s Apollo Electric Inds., 24Village Patparganj (New
Community Centre) Delhi-110091. |
Engineer in Chief (MM). PSEB, Patiala |
7-7-03 to 6-7-08
(5 years) |
Twin Core LT PVC Cavlese |
|
| 14. |
M/s A.R. Transmission (P) Ltd., E-468, Phase-VI, Focal Point
AB, Ludhiana. |
Engineer in Chief (MM). PSEB, Patiala |
12.8.03 to 11.8.08
(5 years) |
ACSR“Raccan”,
”Weasel”,” Rabbit” ACSR Weasel Conductors. |
|
| 15. |
M/s Sharma Sales Corp. J-43, Kirti Nagar, New Delhi-110015 |
Engineer in Chief (MM). PSEB, Patiala |
1.9.03 to 31.8.08
(5 years) |
Insulation Tape. |
|
| 16. |
M/s Overseas Cables, Ltd., Bunny House 28, Yadvindra Colony,
The Mall Patiala-147001. |
Chief Engineer (TL) PSEB, Patiala. |
14.10.04 to 13.10.09
(5 years) |
Cables. |
|
| 17. |
M/s Elkay Telelinks Ltd., Plot No. 141, Sector-24,
Faridabad-121005 |
Chief Engineer
(Hydel Project) MPSEB
Jabalpur (MP)
|
29.10.04 to 28.10.07
(3 years.) |
PVC FRLS Control
& Instrument Cables. |
|
| 18. |
M/s Sonica Enterprises, H.No. 943, FF Phase, 302,
Mohali-160059. |
G.M (O&M) GGSSTP Ropar. |
5.11.04 to 4.11.07
(3 years) |
Jacks and
Grease Guns. |
|
| 19. |
M/s Techno Engineering Co. 425/A, Indl. Area, Phase-II,
Chandigarh-160002. |
Chief Engineer (TL) PSEB, Patiala. |
25.10.04 to 24.10.09
(5 years) |
D/C Tower Material. |
|
| 20. |
M/s Alliance Pipes & Fittings.77, Kunbhorwada.Ist Floor,
Office No -6, Near Moti Talkies Mumbai-400004. |
GM/Thermal,
GNDTP Bathinda
Addl SE
Procurement Cell
|
30-9-04 to 29-9-07
(3 Years) |
MS pipe |
|
| 21. |
M/S S.S Electricals B-215 Lok Vihar (Pitampura) Delhi-34.
|
CPO Central Purchase Orgn. PSEB Patila |
17-12-04 to 16-12-09 (5 Years)
|
Twin Core LT
PVC Cables |
|
| 22. |
M/s Nexo Structures Pvt. Ltd., Ludiana. |
Chief Engineer (TL) Design, Dte, Transmission, B2, Shakti
Vihar, PSEB, Patiala. |
7.4.05 to 6.4.2010
(5 years) |
D/C Tower Material. |
|
| 23. |
M/s Cabsom India, 40/5, Street No.1, Samaipur,
Delhi-110042 |
Chief Engineer
(TC & M) Kerla
State Electy. Board |
Permanently. |
Armoured Copper
Control Cable. |
|
| 24. |
M/s Supra Enterprises, 235, 19-A, Chandigarh-160019. |
The General manager (GGSS)
TP (material Management)
Ropar
|
w.e.f. 13.7.2005 |
Revoking of orders of Blacklisting. |
|
| 25. |
M/s Premier Sanitary wares, 107, Industiral Area, Rani Bazar,
Bikanar, Rajasthan-334001. |
West Bengal Rural Energy Development Corporation Ltd.,
Kolkata-69 |
Upto June 2007 |
Pin Insulators. |
|
| 26. |
M.s Ashwani Kumar Conductor St. No. 1/AB, Hazoora Kapoora
Colony, Barnala Road, Bathinda. |
Sr. Executive Engineer, Colony, Civil Mtc. Cell, GNDTP,
Bhatindha |
23.9.05 to 22.9.08
(3 years) |
Glass Panes. |
|
| 27. |
M/s Engineers Enterprises, 36 Gopal Bar, Jaipur-302001 |
CE(MM) Central Purchase Organization,
The Mall, Patiala |
5.10.05 to 4.10.2010
(5 years) |
GO Switch. |
|
| 28. |
M/s Accurate Transformers Ltd., 8,LSC 3rd
Floor, Sativa Bihar, Delhi-110092 |
Kerla State Electy. Board office of the
CE, Technical Contract and Materials Vydhuthi Bhawanam, Pattom,
Thiruvananthapuram-695004. |
23.11.05 to 22.11.2010
(5 years) |
Transformers. |
|
| 29. |
M/s Punjab Engg. Pre-Stressed (P) Ltd.,
Neelam Cinema Complex, Sector-17E, Chandigarh. |
CE (MM), PSEB, The Mall Patiala-147001. |
23.11.05 to 22.11.2010
(5 years) |
PCC Poles. |
|
| 30. |
M/s Punjab Const. Company, Vill Kakroli,
Mubarkpur, Ramgarh Road, Via Panchkula, Teh. Derabassi, Distt. Patiala. |
CE (MM), PSEB, The Mall Patiala-147001. |
23.11.05 to 22.11.2010
(5 years) |
PCC Poles. |
|
| 31. |
M/s Varsha Cable Pvt. Ltd., No.65, A-2,
Hootagalli, Ind. Area, DIC, Layout, Mysore-570018 |
Chairman, Tamil Nadu Electy. Board 800,
Anna Salai, Chennai-2. |
5.12.05 to 4.12.08
(3 years) |
Armoured Copper
Control Cables. |
|
| 32. |
M/s Deora Wires ‘N’ Machines (P) Ltd.,
Deora Avenue Mitha Khali six Road, Navrangpura, Ahmedabad-380009 |
CE (TL) Design Dte, Transmission, B-2,
Shakti Vihar, PSEB, Patiala. |
11.1.06 to 10.1.2011
(5 years) |
ACSR Zebra Conductors. |
|
| 33. |
M/s Bikanar Porcelain (P) Ltd., F-179-180 Beechwal Indl.
Area, Bikaner. |
CE (MM) Central Purchase Organisation, PSEB, The Mall
Patiala-147001. |
12.1.06 to 11.1.2011
(5 years) |
Pin Insulators. |
|
| 34. |
M/s Bharat Electro-Tech(P) Ltd., GT Road, Channi, PO.
Damtal, Distt. Kangra (HP)-176403. |
Chief Engineer (MM) HPSEB, Shimla-4 |
17.1.06 to 16.1.2011
(5 Years) |
AAA Conductors. |
|
| 35. |
M\S InfoTech transformers Chennai |
Karnataka Power Transmission Corp. Ltd. |
22-2-06To21-2-09 (3years) |
Transformers |
|
| 36 |
M/S Rimatransfkormers and conductors Pvt.Ltd Banglore. |
KPTCL
Chief engineer tenderining & Procurement |
17-3-06To16-3-09 3years) |
Transformers &Conductors |
|
| 37 |
M/S Premier Sanitary Wires, 107, Indl. Area, Rani bazaar
Bikaner. |
Chief Engineer
PSEB Patiala |
22-3-06 to 21-3-2011 (5years)
|
Pin Insulators |
|
| 38
|
M/S Power oil Petroleum Products, 301,Panorama Complex
R.C.Dutt Road Vadodara |
Bihar State
Electricity Board Patna |
22-3-06 to Next two tenders. |
Transformer Oil. |
|
| 39. |
M/s SPIC-SMO (A Division of Southern Petrochemical
Industries Corporation Ltd.) “SPIC HOUSE” 88, Mount Road, Guindy,
Chennai-600032. |
CE(Put) O/o CMDC (WZ), MPPKVVCL, Indore. |
16.1.06 to 15.1.09
(3 years) |
Distribution Transformers. |
|
| 40. |
M/s Ralads Extrusions, Opp. Nehru Park, Yamuna
Nagar-135001. |
SE/HOCE/O&M, GHTP, Lehra Mohabbat. |
16.5.06 to 14.5.09
(3 years) |
S&D of
Telescopic ladder |
|
| 41. |
M/s Sanco Plastic Ltd., 3/1/23, Site-4 Ondl. Area,
Sahibabad Ghaziabad- 201010(UP). |
Engineer in Chief (MM). PSEB, Patiala |
23.5.06 to 22.5.2011
(5 years) |
Twin core
PVC Cables |
|
| 42. |
M/s Raja Foundary & Engg. Works Gargi House, Inside
Sirhindi Gate, Patiala. |
Engineer in Chief (MM). PSEB, Patiala |
5.6.06 to 4.6.2011
(5 years) |
Dead End Clamps. |
|
| 43. |
M/s Badaya Cables & Conductors Pvt. Ltd., 217, Shalimar
Complex, M.I. Road, Jaipur-302001. |
Engineer in Chief (MM). PSEB, Patiala |
3.6.06 to 7.6.201
(5 years) |
ACSR Rabbit
Conductors |
|
| 44. |
M/s M/s Switchgear and Structurals (P) Ltd., Plot No. 132
& 1333 Phase-V, Hyderabad-500055. |
Orisa Power Trans Corp. Ltd.,
Jana path, Bhubaneshwar. |
19.6.06 to 7.6.2011
(5 years) |
Double Breaker Issolators. |
|
| 45. |
M/s Satluj Ropes Pvt. Ltd., 583/84 Indl. Area-B,
Millerganj, Ludhiana-141003. |
Engineer in Chief (MM). PSEB, Patiala |
14.7.06 to 13.7.2011
(5 years) |
GSS wire. |
|
| 46. |
M/s Bhadora Industries, 4 U.S. Indl. Estate Dhonga, PSEB,
Patiala. |
Engineer in Chief (MM). PSEB, Patiala |
3.7.06 to 2.7.2011
(5 years) |
PVC Cables. |
|
| 47. |
M/s Screws India, Plot No. 27, Phase-III Indl. Area,
Gangyal, Jammu Tawi. |
Engineer in Chief (MM). PSEB, Patiala |
6.7.06 to 5.7.2011
(5 years) |
PG Clamps for Conductors sizes. |
|
| 48. |
M/s Jyoti Ltd., 50, Hanuman Road, Rajeev Chowk, New
Delhi-110001 |
Power Development Department Jammu and Kashmir. |
Declared Bad supplier. |
VCB Panel sets. |
|
| 49. |
M/s SRI Ganesh Export, A-S, Tarapare Gardens, Lokhandwala
Andhari West, Mumbai-400053. |
Director/TT, PSEB, Patiala. |
27.7.06 to 26.7.2011
(5 years) |
Online UPS. |
|
| 50. |
M/s Alok Enterprises, Shree Ram Place Flat No.203, 2nd
Floor, East Boring Canal Road, Patna/Bhopalka House, East Boring Canal Road,
Vishnu Place Lane, Patna-800001. |
Bihar State Electy. Board Patna
CE(S&P) |
21.7.06 to 20.7.2011
(5 years) |
AB Switch. |
|
| 51. |
M/s Rajasthan Transmission Wires (P) Ltd., C-102,
Maharaja Apartments, Devi Marg, Bani Par, Jaipur. |
Chief Engineer (TL) PSEB, Patiala. |
10.8.06 to 9.8.2011
5 years) |
ACSR Zebra
Conductors |
|
| 52. |
M/s Superlink Poly Fab Ltd., A-98, Surajmal Vihar,
Delhi-110092 |
Engineer in Chief (MM). PSEB, Patiala |
7.8.06 to 6.8.2011
(5 years) |
ACSR Conductors |
|
| 53. |
M/s Deora Wires ‘N’ Machines (P) Ltd., Deora Avenue Mitha
Khali six Road, Navrangpura, Ahmedabad-380009 |
Engineer in Chief (MM), PSEB, Patiala |
11.1.06 to 10.1.2011
(5 years) |
ACSR Conductors. |
|
| 54. |
M/s Rajdhani Tele Products, Abhaiya Chandra Dutta Lane,
Kumarpura, Guwahati. |
BSEB Project Manager, Technical Services, Shastri Nagar,
Patna-800023. |
w.e.f. 7.9.06 for two tenders. |
Aluminum Winding Wire. |
|
| 55. |
M/s Aditya Power Devices, Dal Mandi, Bulandshaher-203001. |
Engineer in Chief (MM), PSEB, Patiala |
2.11.06 to 1.11.2011
(5 years) |
GO Switches. |
|
| 56.
|
M/s Bajaj Electrical Ltd., 45/47 Veer Narian, Mumbai.(
Debarred and Blacklisted) |
Chief Engineer(PUR) O/O CMD (WZ) MPPKVVCL, Indore.
|
19.9.06 to 18.9.09
(3 years) |
Construction of New 11KV, LT line 1/0.433 Distribution S/Stns. |
|
| 57. |
M/s Impact Cables 458-468 Shambu Nath Compound, Gali No.
8 Friends Colony, Industrial Area, G.T. Road, Shahadara, Delhi. |
Engineer in Chief (MM), PSEB, Patiala. |
15.9.06 to 14.9.2011
(5 years) |
LT PVC Cables. |
|
| 58. |
M/s Pacific Instruments (P) Ltd., 203, Sasco Bhawan,
Azadpur Commercial Complex, Delhi-110033. |
CE (MM) Shakti Bhawan, Sector-6, Panchkula. |
w.e.f. 19.9.06. |
Distribution Transformers. |
|
| 59. |
M/s Victory Transformers & Switchgears Ltd, D-52, Phase
IV (Extn) IDA Jeedimetla. |
Engineer in Chief (MM), Central Purchase Orgn. PSEB,
Patiala. |
13.11.06 to 13.11.2011
(5 years) |
Distribution
Transformers |
|
| 60. |
M/s Sapa Electrical (P) Ltd., Ist & 2nd Floor, Manas
Mandir Business Complex, Durga Khud Road, Varanasi-221005. |
UHBVN LIMITED
O/o CE (MM) Shakti Bhawan, Sector-6, Panchkula
|
w.e.f. 19.6.06 |
Distribution Transformers |
|
| 61. |
M/s United Cables Industries A-14, Sector-4 No.IDA Distt.
Gautam, Budh Nagar (UP). |
Chief Engineer (O&M) GHTP
Lehra Mohabbat. |
7.12.06 to 7.12.09
(3 years) |
Copper Flexible Cables. |
|
| 62. |
M/s Mecca Power (P) Ltd., Teh. Road Sardulgarh-151507
Distt. Mansa(PB). |
Chief Engineer(MM) DHBVN, Hisar. |
20.11.06 to 20.11.09
(3 years) |
Distribution Transformers |
|
| 63. |
M/s Sonelite Indl. Corporation, 1625/2(New F-56) ,
Dwarkapuri, Naveen, Shahdra, Delhi-110032. |
CE (MM) Central Purchase Orgn. PSEB, Patiala. |
30.11.06 to 29.11.2011 (5 years) |
Tinned Copper Fuse wire of various sizes.
|
|
| 64. |
M/s Poonam Industries E/35/1-2, Industrial Area,
Jullandhar. |
CE (MM) Central Purchase Orgn. PSEB, Patiala. |
28.11.06 to 27.11.2011 (5 years) |
Nuts & Bolts of assorted sizes. |
|
| 65. |
M/s Weldon Spares Corporation, 21/22, Mayes tic Shopping
Complex Centre, 144, Gurgaon Road, Mumbai-400004 |
Chief Engineer Thermal, Procurement Cell, O&M GNDTP,
Bathinda. |
3.1.07 to 2.1.2010
( 3 years) |
Spare of A1 DOZER. |
|
| 66. |
M/s Pareek Cables 340-A/14, Friends Colony, Industrial
Area, Gali No.1A, Shahdara, Delhi-110095 |
CE (MM) Central Purchase Orgn. PSEB, Patiala |
25.1.07 to 24.1.2012
|
Twin Core LT PVC Cables. |
|
| 67. |
M/s Gupta Ceramic Production, Company Co-op Industrial
Society Ltd., Behind Housing Board Colony, Exta Colony Kankheli , Road
Rohtak. |
CE (MM) Central Purchase Orgn. PSEB, Patiala. |
7.2.07 to 6.2.2012
(5 years). |
Kit Kat. |
|
|
68. |
M/s Jyoti Ltd., 50, switchgear, 44-59, BIDC,
Vadodara-390016.
|
Chief Engineer/S/
Stn.Design DTC, S/Stn, PSEB, Patiala |
15.2.07 to 14.2.2012
(5 years). |
VCB Panel sets. |
|
|
69. |
M/s Precto Engineers 188-B, Indl. Area, Phase-I,
Chandigarh. |
Engineer in Chief (MM), PSEB, Patiala. |
19.2.07 to 18.2.2012
(5 years) |
PCC Poles.
|
|
|
70. |
M/s Superlink Poly Fab Ltd., B-4, Surimal Vihar,
Delhi-110092 |
Engineer in Chief (MM). PSEB, Patiala |
22.1.07 to 21.1.2012
(5 years) |
ACSR Panther Conductors
|
|
|
71. |
M/s East India Udhyog Limited Ghaziabad.145 G.T. Road,
Salibabad. |
Chief Project Director (Distribution) ADB Cell, MPSEB,
Jabalpur.
|
2.2.07 to 1.2.2012
(5 years) |
Distribution Transformers
|
|
|
72. |
M/s Master Cables, Killikolloor, Kollam, Kerla State. |
Chief Engineer (TC&M) Vidhyuthi Bhawanam, Pattom Tiruvananthapuram
695004. |
Firm Suspended due failure of supply. |
Hardware Fittings.
|
|
|
73. |
M/s Nu-Line Industries (P) Ltd., 36-37, Industrial Area,
Sector-I, Parwanoo-173220(HP) |
Engineer in Chief (MM). PSEB, Patiala
|
4.5.07 to 3.5.1012
(5 years). |
ACSR 100 mm |
|
|
74. |
M/s Bhojpur Engineerings Works (P) Ltd. Gaya. |
Engineer in Chief (MM). PSEB, Patiala |
For next two consecutive tenders of Bihar State. |
Transformers.
|
|
|
75.
|
M/s Andrew Yule & Co. Ltd., Electrical Division, Transformer
& Switchgear Unit, 5/346, Old Mahabalipuram Road, Perungudi, Chennai-600096. |
Engineer in Chief (MM). PSEB, Patiala.
|
14.5.07 to 13.5.2012
(5 years). |
Transformers. |
|
|
76. |
M/s S.V. Systems E-108, Site-B, Upside, Surajpur
Industrial Area, Greater Noida, Distt. Gautam Budh Nagar (UP). |
Engineer in Chief (MM). PSEB, Patiala.
|
11.5.07 to 10.5.2012
(5 years) |
Aluminium Tubular Terminal Ends. |
|
|
77.
|
M/s R.S Traders H/No. 762(HIG) Phase-I Urban Estate,
Patiala, PB.
|
DY CE (MM), PSEB, Ropar. |
20.8.04 to 19.8.7 |
P.O.
|
|