HIMACHAL PRADESH STATE
ELECTRICITY BOARD
COST DATA FOR
EHV TRANSMISSION
LINES & SUB-STATIONS
FOR THE YEAR 2007-2008
|
COST
DATA FOR EHV TRANSMISSION LINES AND SUB-STATIONS
FOR THE YEAR 2007-08
1.
THE COST DATA FOR SUB-STATION EQUIPMENTS INDICATES THE RATES FOR
INDIVIDUAL ITEMS. THE COMPLETE ESTIMATE FOR A WORK SHALL HOWEVER BE PREPARED ON
THE BASIS OF ACTUAL LAY OUT OF THE SUB-STATION AND OTHER REQUIREMETNS, ETC.
2.
COST OF CIVIL WORKS FOR SUB-STATION EQUIPMENT AND TOWERS HAS BEEN
INCORPORATED ON AN AVERAGE BASIS WHICH OTHER WISE VARIES FROM PLACE TO PLACE
DEPENDING UPON THE PREMIUM. PREVALENT IN DIFFERENT AREAS. THE AREA/SITE
SPECIFIC CONDITIONS SHALL ALSO BE TAKEN INTO ACCOUNT WHILE PREPARING THE
ESTIMATES.
3.
COST OF LAND FOR SUB-STATION ALONGWITH COST OF ITS SITE DEVELOPMENT WHICH
DEPENDS UPON THE REQUIREMENT OF LAND FOR FEEDER / COUPLER / TRANSFORMER BAYS AND
TRANSFORMATION CAPACITY ETC. VIZ-A-VIZ EXISTING INFRASTRUCTURE AND ALSO THE
REQUIREMENT OF RESIDENTIAL/NON-RESIDENTIAL BUILDINGS IS NOT ENVISAGED IN THE
COST DATA AND WIIL BE INCORPORATED IN THE ESTIMATES AS PER ACTUAL REQUIREMENTS.
4.
ESCALATION IN RESPECT OF THE PERIOD OF IMPLEMENTATION BEYOND 1.4.2007
SHALL BE CHARGED @ 10% PER ANNUM (WITH ANNUAL COMPOUNDING) OVER AND ABOVE THE
RATES INDICATED IN THIS COST DATA. THE ESCALATION SHALL BE CHARGED FROM 1.4.2007
TO THE DATE OF COMMISSIONING OF THE WORKS. ESCALATION FOR PART OF YEAR SHALL BE
WORKED OUT ON PRORATA BASIS IN PROPORTION TO THE NUMBER OF MONTHS.
5.
THE RATES OF COST DATA FOR 2007-08 HAVE BEEN ESTIMATED BY TAKING INTO
ACCOUNT THE VARIOUS PURCHASE ORDERS PLACED DURING THE YEAR 1.4.2006 TO
31.03.2007 / IEEMA CIRCULARS IN CASE OF ITEMS / EQUIPMENTS FOR WHICH NO PURCHASE
ORDERS WERE PLACED DURING THIS PERIOD / ESTIMATED PRICES AT CURRENT PRICE
LEVEL.
6.
THE ESTIMATES FOR THE WORKS/EQUIPMENTS NOT SPECIFICALLY COVERED IN THE
COST DATA SHALL BE PREPARED BY SUITABLY TAKING INTO ACCOUNT. THE ESTIMATED COST
OF THE OTHER SIMILAR EQUIPMENTS/WORKS INCLUDED IN THE COST DATA ALONGWITH
SUITBALE MODIFICATIONS AND THE EFFECT OF OTHER RELEVANT FACTORS SPECIFIC TO THE
WORKS/EQUIPMENT TO BE ESTIMATED.
7.
THE COST DATA IS APPLICABLE FOR CONVENTIONAL TYPE OF SUB-STATIONS(I.E
MANNED AND WITHOUT ANY PROVISION FOR SCADA ETC) AND DOES NOT COVER THE
UNMANNED/REMOTE CONTROLLED SUB-STATIONS. THE PRICES FOR THE EQUIPEMNTS/OPTICAL
FIBRE CABLES IN SUCH CASES SHALL BE ESTIMATED ON THE BASIS OF CURRENT MARKET
PRICES AS MAY BE AVAILABLE FROM TIME TO TIME.
8.
IN CASE OF WORKS AWARDED ON TURN-KEY BASIS AFTER FLOLLOWING THE BIDDING
PROCESS. THE ESTIAMTES SHALL BE PREPARED/REVISED ON THE BASIS OF COST AS PER
SUCH AWARDS.
|