Basinwise Potential in H.P.
YAMUNA   BASIN

S.No. Name River/Khad MW Status
1 Andhra Andhra Khad 16.95 I
2 Giri Giri Khad 60 I
3 Yamuna Projects From H.P Catchments 131.57 I
4 Gumma S.H.P Gumma Khad 3 I
5 Rupin Rupin Khad 39 IV
6 Renuka Dam Giri Khad 40 V
7 Tangnu Romani Pabbar River 44 V
8 Paudital-Lassa Paudital-Lassa 24 V
9 Dhamwari Sunda Pabbar River 70 V
10 Swara Kuddu Pabbar River 110 V
11 Shalvi Pabbar River 7 VI
12 Chirgaon-Majhgaon Pabbar River 46 VI
  Total   591.52  
I. Under Operation.   211.52  
II. Under Construction with State Sector. 110  
III. Under Investigation.      
IV. Projects identified   39.00  
     
VI DPR Ready   231.00  